Author
The event consisted of a 1-day build with rehearsals, followed by a full-day meeting with the dinner in the evening, before an overnight de-rig.
The AV solution for the event consisted of:
Set – 12ft tall set panels with twin 14ft wide projection screens. The set was covered in white leathergrain with the client’s logo applied in vinyl.
Stage – 10m x 2m carpeted in grey with a black cotton casement material covering the front and sides
Rigging – An 18m front of house span with two 11m advanced trusses of Prolyte H30V
Audio – An L-Acoustics PA system consisting of X8’s, 5XT’s and SB18’s. Eight ways of radio microphones with headsets and a Yamaha QL5 for control.
Video – A pair of 10,000-lumen projectors with Windows laptops for PPT and MacBooks for VT playback, all running through a seamless switcher. A comfort monitor and timer on stage for the presenters.
Lighting – Room wash was covered with Chauvet COLORado Q40’s and R2X wash’s. The set was uplit using Elation Sixbars and stage was provided by ETC Source 4’s.
A team of six technicians were on-site for the installation, show and de-rig, and the kit weighed in at just over 7 Tonnes.
Client feedback was great and we are already booked for the next event.
Give Us a Call
Drop Us an Email
Follow Us